Hi everyone, we have a situation where we will lose power to the building for 14 hours and since we don't have a generator we'll be shutting down our main site. We have 15 sites, each has a dc and the hq site has two with the fsmo roles distributed between the two at hq. So two questions to start with:
1. What will be the impact of having the fsmo role holding domain controllers inaccessible for a period of 14 hours?
2. What will we be facing once we regain power and turn the hq dc's back on?
Look forward to hearing back about this - the power outage is this weekend though!!